CTC 462 LAB 5 (Channel/Outlet Protection)

Using the Bank and Channel Protective Lining Design Procedures, NYSDOT, Bureau of Soil Mechanics, August 1971, determine the end section outlet protection for each culvert to be retained/replaced (see Lab 1/4).

 Also determine the ditch linings (is grass adequate?) for the ditches at the following locations:

Ditch Location

Q10 (cfs)

Sta 21 to 25

3.6

Sta 27 to 33

10

Sta 37 to 42+50

10

Sta 43 to 46

11

Sta 46 to 49

40

 

SUNYIT Home | Baran's Classes | ISET Home | E-Mail S. J. Baran