CTC 462 LAB 8 (Drainage Report)

Prepare a drainage report summarizing the drainage design of labs 1-7. Use the following format:

 Section 1-Drainage Narrative

 A. Hydrology

            1. Design Frequencies

            2. Method for Peak Flows

            3. Nomographs/Curves

            4. Curve Numbers and Runoff Coefficients

            5. Time of Concentration

B. Storm Sewer Design

            1. Methodology of Design

            2. Drainage Areas/SurroundingTerrain

            3. Runoff and Culvert Analysis

            4. Selection of Pipe Material

C. Channel and Outlet Protection

D. References

 

Section 2-Culvert Analysis

A. IDF Curves/Nomographs

B. Drainage Area Maps

C. Runoff Calculations

D. Cross Culvert Analysis (HY 8 Printouts)

  

Section 3-Channel and Outlet Protection

1. Outlet Protection Backup

2. Ditch Lining Analysis

 