CTC 261 Labs and Projects

CTC 261-Hydraulics has a dedicated 2-hour lab time consisting of two laboratory experiments and one design project.

 The experimental labs will consist of two experimental labs (visualization, hydrostatics-old equip).   In addition modifications will be made to the hydrostatics lab.

The following detailed information on the experimental labs can be found on Brightspace-Content (Intro to Labs):

·         Grading Guidelines for Lab Reports

·         Lab Report Guidelines

·         MSDS sheet for “Sodium Sulfate Anhydrous)

·         Flow Visualization using the Hydrogen Bubble Generator

·         Center of Pressure (old equipment)

 

 

The design project will consist of a one culvert replacement project.  You will work on your assigned team.

Culvert Replacement Design Project:

An existing map and stream profile can be found in brightspace (or handed out in class)

Evaluate the hydraulic adequacy of the culvert for a design discharge of 860 cfs and AHE (allowable headwater elevation) equal to the top of road (elevation 184.5’).  The computed tailwater depth is 3.9 feet, giving a tailwater elevation of 181.3 feet. 

Design a replacement culvert using flared wingwalls and a square edge entrance.   Multiple barrels will be required.

Include the following in a report/excel file/ or a poster.

·         Cover Sheet (title, date, names, manhours)

·         Introduction

·         Description of existing conditions and proposed culvert size

·         Cost Estimate Summary:

Resources (MEANS book-Library; Online Manufacturers that sell drainage structures; NYSDOT Prices https://www.dot.ny.gov/divisions/engineering/design/dqab/waipr )

·         Maintenance and Protection of Traffic

·         Appendix A: Plan (Profile and Cross-Section Drawings (with borders); Plan showing upstream headwater impacts

·         Appendix B: Culvert Worksheets (include CulvertMaster Printouts)

If you use a poster:

Search for a “good” poster template (use 36”wide by 24” high)

Suggestion:  https://www.posternerd.com/sciposters-templates

 

NYSDOT 203-04 Installation Details for Reinforced Concrete Pipes:  https://www.dot.ny.gov/main/business-center/engineering/cadd-info/drawings/standard-sheets-us-repository/203-04_02032021.pdf

NYSDOT 203-05 Installation Details for Corrugated and Structural Plate Pipe, Pipe Arches and Plastic Pipes: https://www.dot.ny.gov/main/business-center/engineering/cadd-info/drawings/standard-sheets-us-repository/203-05_02032021.pdf

 

 

 