CTC 440 - Homework 7 (Superelevation)

A) Develop a superelevation diagram (from "begin runout" to "end full super") using the following information:

2-lane rural highway

Design Speed 90 km/hr

Radius = 1000 meters

Curves to the left

TS - STA 17+000

SC - STA 17+031

CS - STA 18+050

ST - STA 18+081

Notes:

B. Assuming 3.6-meter lanes calculate the elevation of the pavement edges (both left and right) at Sta 17+020 if the elevation of the centerline at Sta 17+020 = 365.000 meters.