CTC 450 Asynchronous Projects 

1. Flowmaster Project For Flowmaster Project Mini-Report Include:

·         Problem Statements (can copy images and paste)—for all 5 individual problems---see below

·         Summary of Results (image of software, and include results in your own words with appropriate technical depth)

·         Written summary of any difficulties/confusion when working the problems

·         Place mini-report in Brightspace Dropoff Folder (.pdf format)

 

Flowmaster (Individual--work all 5 problems)

·         Chapter 1, problem 2 (Description: concrete and cmp pipe comparison)

·         Chapter 1, problem 5 (Description: variation of roughness coefficient)

·         Chapter 1, problem 8 (Description: size cast iron pipe)

·         Chapter 1, problem 9 (Description: Hazen-Williams versus Darcy-Weisbach Method)

·         Chapter 1, problem 10 (Description: performance curves for 8”, 10” and 12” pipes)

 

 

Will go over the other asynchronous projects in class:

 

2. brightspace quizzes—will take approximately 2 hours

 

3. operator worksheets 107/114---show work for #114 (some equations used will be on the final)-See Brightspace Assignment

 

4. chapter 11-14 select problems (solid waste, hazardous waste, air pollution, and noise pollution)—will not be on final-See Brightspace Assignment

 

 

SUNY Poly Home | Baran's Classes | ISET Home | E-Mail S. J. Baran