CTC 440 - Homework 23 (Concrete Box Culverts)

Download the following files for this homework.  Note: These are rescinded files and only to be used for this class homework assignment.

CBC 1

CBC 2

CBC 3

Given the following:

Fill height: 8'

Span: 15'

Height: 9'

Length: 40'

a) Draw the barrel section (using Microstation or AutoCAD). 

          b) Complete a bar list, calculate steel and concrete quantities, and determine the total price of the culvert (using an excel spreadsheet)

·       Assume concrete price is $200/cy

·       Assume steel is $0.90/pound

Note:  Drawings/Tables should be detailed enough to be “buildable”.